Long O Donnell Win Feasibility Study for Part Replacement of Pipeline

Under the Mechanical Services - Design Consultancy Framework for Wales and West Utililties, Long O Donnell have been successful in winning the preparation of a feasibility study for the part-replacement of the Wickwar – Swindon pipeline. This is a Local Transmission System pipeline North of Malmesbury which requires partially replacing in connection with a proposed major housing development by one of the country’s leading housing developers. 

Archilles Logos RICS Logo
Long O Donnell Win Feasibility Study for Part Replacement of Pipeline for Wales and West Utilities