Adnams Biofuels

« Back to the Portfolio

A new anaerobic digestion facility, run by Bio Group Ltd and located at Adnams Brewery, will process brewery waste to produce biogas. A new above ground installation has been designed in order for the gas to be enriched, odorised, controlled and metered, before the resultant bio methane is introduced into the National Grid distribution network at the required quality specification. The project is proposed to include the following:

  • Twin filter & regulator streams in standard T/SP/E/33 skid.
  • Controlled Propane injection system to reach target calorific value.
  • Twin fiscal metering streams
  • Actuator controlled emergency slam shut valve to prevent out of specification gas from entering the National Grid distribution network
  • Odorant injection equipment.

Connection to the existing 3” IP steel main involves the laying of approximately 200m of below ground 4” steel pipeline with connection being made with a grouted under pressure Tee.

Project Management responsibilities for the project including; Ensuring planning of the project including management of consents, licenses and permits; Ensuring Design implementation including dealing with technical issues; Ensuring CDM implementation; Ensuring HSE management; Progress and finance management during construction; Dealing and resolution of technical issues during construction.

Quantity Surveying responsibilities include Project cost monitoring and reporting throughout the lifecycle of the project; Drafting and preparation of tender documentation; Evaluations of tenders and preparation of award recommendation reports; Contract Management during construction including EW/CW administration and contractual correspondence; final account negotiation and settlement.

Pre-Construction H & S Information Pack (within ITT), draft F10. CDM Coordinator responsibilities and HSE Inspections/audits on a regular basis and H&S advisor presence throughout project. Assisting in completion of Data Books as per requirements of client procedures.

Client

National Grid

Project Value

Undisclosed

Project Duration

Undisclosed

Services Provided

Archilles Logos RICS Logo
Adnams Biofuels,

A new anaerobic digestion facility, run by Bio Group Ltd and located at Adnams Brewery, will process brewery waste to produce biogas. A new above ground installation has been designed in order for…