This project is to install river bank erosion protection so that the river erosion rate can be reduced in order to protect the longevity of an adjacent high pressure gas pipeline.  The construction works will consist of the improvement of approx 1250m of existing track, the installation of approx 650m of temporary roadway and a site compound, re-grading of 160m of river bank to a safe angle, installation of 160m of rock armour protection along the toe of the river bank slope, installation of approx 3,000m2 of brush willow mattress and turf matting (geotextile composite), installation of approx 20m dressed stone, coppicing of selected trees and planting of selected flora.

Client

National Grid

Project Value

Confidential

Project Duration

24 months

Services Provided

Archilles Logos RICS Logo
River Teme Riverbank Erosion Project,

This project is to install river bank erosion protection so that the river erosion rate can be reduced in order to protect the longevity of an adjacent high pressure gas pipeline.  The construction…