This project was the extensive repair to the floor plates and possibly the lower wall to floor weld area.

Long O Donnell provided CDM works as follows:

  • Issued F10, notified HSE
  • Reviewed Construction Phase plan, sent adequacy letters for construction to start.
  • Monitor the Construction Phase Plan and advise the client of suitability and managing the flow of health and safety information between all parties.
  • Finalize the layout for the Health and Safety File, in talks with PSN and client.
  • Site visits and audits during removal and reinstallation of the Gas Chiller.
  • Complete Health and Safety File, hand over file to Client

 

Client

Conoco Phillips

Project Value

£1000

Project Duration

6 weeks

Services Provided

Archilles Logos RICS Logo
Theddlethorpe Gas Terminal Storage Base D-301,

This project was the extensive repair to the floor plates and possibly the lower wall to floor weld area.

Long O Donnell provided CDM works as follows:

  • Issued F10, notified HSE
  • Reviewed…