National Grid Engineering Drawing Contract

« Back to the Portfolio

Long O Donnell Associates have secured the framework for National Grid—Engineering Drawing Contract. This contract involves providing drawing Creation / Modification and Management Services related to engineering drawings for National Grid UK gas transmission assets.

The drawings will be required to be provided in specified formats and will include a range of mechanical/civil engineering, electrical and instrumentation disciplines.

Long O Donnell Associates will be required to provide verification of existing operational drawings, on-site data capture and the production of operational drawings for the Rye House AGI project.

Client

National Grid

Project Value

£1M

Project Duration

2010 - 2013

Services Provided

Archilles Logos RICS Logo
National Grid Engineering Drawing Contract,

Long O Donnell Associates have secured the framework for National Grid—Engineering Drawing Contract. This contract involves providing drawing Creation / Modification and Management Services related…