OCTIP will provide onshore compression facilities on the Dimlington terminal; rationalise and consolidate the facilities on the BP Easington and Dimlington terminals and re-route the processing of the amethyst stream from the Centrica Storage Ltd Easington Terminal to the BP Dimlington Terminal.

The facilities will comprise: Easington terminal inlet facilities relocation to Dimlington Terminal, onshore pipeline changes to divert Amethyst gas from CSL to Dimlington, fiscal quality metering of the areas import and export gas, treatment and conditioning of the ‘whole area’ gas on Dimlington Terminal, two turbine driven multi stage compression trains, modifications to the existing utility systems (firewater, air, nitrogen) and the control and safety systems associated with the new facilities, addition of and re-routing of pipelines, and addition of two train compression package.

This project comprises of two phases to be completed including construction of new and decommissioning of redundant plant segregated into four areas:

  • Dimlington terminal
  • Easington terminal
  • Onshore link pipelines
  • Modifications to offshore facilities

Long O Donnell Associates was commissioned for the provision of Project Support services for full CDM Co-ordination Services, Health, Safety and Environmental Services to support the pre-construction and construction stages of the project.

Client

BP

Project Value

Confidential

Project Duration

June 2007 - Ongoing