Welsh Water Ltd (WW) are considering the construction of a Bio-Gas Production Facility at the Five Fords Waste Water Treatment Works located in Wrexham. The Bio-Gas Production Facility will connect to the local Wales and West Utilities (WWU) gas network.

Long O Donnell have been appointed to conduct a Feasibility Study to determine if the construction of a Bio-Gas plant is economically viable, and if so, what practical construction and operational options are available to WWU & WW.  The Feasibility Study will include but is not limited to; Site data capture, high level MTO production, high level risk assessments, budget estimate, project programme, and report production.