LATEST NEWS

More News

Three's not a crowd with SGN

« Go Back to 2007

Following successful awards for Commercial Services and Planning Supervision, Long O Donnell Associates are pleased to announce the award of another framework with Scotia Gas Networks, for QA/QC Pipeline Inspection Services covering both their South of England and Scottish gas distribution systems.

These contracts include all Commercial and CDM/Health & Safety work on projects both sides of the border including two high-pressure pipelines in the South. The Farningham to Hadlow 1200mm dia. pipeline runs for 23km and is due for construction in 2009. Also due in 2009 is the Crawley Down to Shamblehurst pipeline covering 38km of cross-country terrain.

These frameworks emphasise the strength our relationship with SGN and its determination to remain dedicated to its existing clients whilst expanding into new areas.

Tom O'Donnell was thrilled on being told the news: "Our employees work hard to ensure that LOD have a reputation of always delivering the best and most dedicated service. These awards by SGN goes to show that Long O Donnell Associates are still at the forefront of both commercial and project services in both the gas transmission and distribution sector".

 

Archilles Logos RICS Logo
Three's not a crowd with SGN